FIDIC土木工程施工合同条件(红皮书英文版)
general conditions of contract
PART I - GENERAL CONDITIONS of CONTRACT........................................................................7
Definitions and Interpretation.......................................................................................................7
1.1 Definitions...........................................................................................................................7
1.2 Headings and Marginal Notes............................................................................................8
1.3 Interpretation......................................................................................................................8
1.4 Singular and Plural.............................................................................................................8
1.5 Notices, Consents, Approvals, Certificates and Determinations........................................8
Engineer and Engineer's Representative....................................................................................9
2.1 Engineer's Duties and Authority.........................................................................................9
2.2 Engineer's Representative.................................................................................................9
2.3 Engineer's Authority to Delegate........................................................................................9
2.4 Appointment of Assistants..................................................................................................9
2.5 Instructions in Writing.........................................................................................................9
2.6 Engineer to Act impartially................................................................................................10
Assignment and Subcontracting................................................................................................11
3.1 Assignment of Contract....................................................................................................11
4.1 Subcontracting.................................................................................................................11
4.2 Assignment of Subcontractors' Obligations.....................................................................11
Contract Documents..................................................................................................................12
5.1 Language/s and Law........................................................................................................12
5.2 Priority of Contract Documents........................................................................................12
6.1 Custody and Supply of Drawings and Documents...........................................................12
6.2 One of Copy of Drawings to be Kept on Site...................................................................12
6.3 Disruption of Progress......................................................................................................12
6.4 Delays and Cost of Delay of Drawings.............................................................................13
6.5 Failure by Contractor to Submit Drawings.......................................................................13
7.1 Supplementary Drawings and Instructions.......................................................................13
7.2 Permanent Works Designed by Contractor......................................................................13
7.3 Responsibility Unaffected by Approval.............................................................................13
General Obligations...................................................................................................................14
8.1 Contractor's General Responsibilities..............................................................................14
8.2 Site Operations and Methods of Construction.................................................................14
9.1 Contract Agreement.........................................................................................................14
10.1 Performance Security.....................................................................................................14
10.2 Period of Validity of Performance Security.....................................................................14
10.3 Claims under Performance Security..............................................................................14
11.1 Inspection of Site............................................................................................................14
12.1 Sufficiency of Tender......................................................................................................15
12.2 Adverse Physical Obstructions or Conditions................................................................15
13.1 Work to be in Accordance with Contract........................................................................15
你可能喜欢
- FIDIC合同英文版
- 建筑中英文对照
- 土木工程施工合同条件
- 建设工程施工合同示范文本
- 建筑英语
- 土木工程专业英语词汇
- FIDIC设计采购施工(EPC)合同条件(银皮书英文版)96页
- FIDIC土木工程施工合同条件(红皮书英文版)56页
- FIDIC合同英文版红皮书99版本_secretpart 05_secret2页
- FIDIC合同英文版红皮书99版本_secretpart 04_secret13页
- FIDIC合同英文版红皮书99版本_secretpart 03_secret3页
- FIDIC合同英文版红皮书99版本_secretpart 02_secret3页
- 城市规划与建筑设计术语中英文对照16页
- 中英文对照-建筑材料86页
- 建筑施工名词中英文对照5页
- 建筑工程中英文对照33页
- 建筑施工混凝土裂缝的预防与处理中英文对照16页
- 常用建筑术语中英文对照l5页
- 第13章 FIDIC土木工程施工合同条件21页
- FIDIC土木工程施工合同条件演变简史3页
- (红皮书中文版)FIDIC土木工程施工合同条件-87版35页
- FIDIC合同条件在国际土木工程施工项目管理中的应用5页
- FIDIC土木工程施工合同条件(99年第一版)89页
- FIDIC土木工程施工合同条件28页
- 建设工程施工合同示范文本(GF-1999-0201)填写范例14页
- 建设工程施工合同示范文本26页
- 建设工程施工劳务分包合同示范文本22页
- 河北省建设工程施工合同(示范文本)85页
- 建设工程施工合同示范文本29页
- 建设工程施工合同(示范文本)33页
- 建筑专业英语词汇8页
- 建筑工程词汇 英语类 提高你的工程英语词汇量8页
- 建筑工程英语词汇大全66页
- 建筑学英语(全修改版!)32页
- 6 土木建筑工程英语术语24页
- 建筑英语常用词汇8页
- 土木工程专业英语词汇18页
- 土木工程专业常用英语词汇26页
- 土木工程专业英语词汇[1]37页
- 土木工程专业英语词汇总结汇总51页
- 土木工程专业英语词汇(大学)9页
- 土木工程专业英语词汇短语总结9页


