水库调洪计算程序

水库调洪计算程序

ZVKhQ2m1

1.6ZHq1q2qKzvVKqv

750.5010

B

45

8040.712140h

116

85101.22471090232.63627995454.44813110077.56.560651051198.37232

116118020203.6468101010213.646816.716.7250.7284.1

0.16400912012212412612846810125761058.1795691629.1742276.842992.98379510101010105861068.1795691639.1742286.843002.98379516.716.716.720.920.9317.5350.9384.3421.9463.70.08970.06926880.0584940.0580550.058368159

t

1224364848

▽t

121212120

Q

10140710279250131

Q1+Q2/2Q1+Q2/2*▽tq

75425494.5264.5190.5

3.2418.3621.362411.42648.2296

1027.29883135.2404282.899213.6468

2458

q1+q2/218.6494281.26961209.0697248.27291335.823

q1+q2/2*▽t0.4028273861.7554236084.5159055025.362694212

你可能喜欢

  • 设计洪水
  • 设计过程
  • HEC-RAS
  • 流量计算
  • 水文计算
  • 水文水利计算

水库调洪计算程序相关文档

最新文档

返回顶部