高架道路工程赶工措施费索赔实践与浅析

高架道路工程赶工措施费索赔实践与浅析

【摘要】赶工措施费索赔事件发生后,赶工措施费索赔的准备、根据论证、报告编制、费用计算是对工程管理的一个重大挑战。本文结合上海某城市高架道路工程赶工措施费索赔实践,对城市高架道路工程赶工措施费索赔的根据论证、费用计算、谈判技巧等几方面问题进行浅析。

【关键词】赶工措施费; 索赔; 高架道路工程

【 abstract 】 the crush measures fee claim after the incident, the crush measures of preparation, according to claim for demonstration, report preparation, cost calculation of engineering management is one of the major challenges. combining with the shanghai some urban elevated road

engineering extra measures fee claims the practice, urban elevated road engineering extra measures according to the argument, the fee claim expenses and negotiation skills in such aspects as the guide-subject problem.

【 keywords 】extra measures fee; claim for compensation; elevated road engineering

【中图分类号】u41 /文献标识码【文章编号】

1、前言

赶工措施费索赔或称工程加速索赔,是指工程合同履行过程中,发包人或工程师要求的缩短工期,或者非承包人责任导致工期延