采矿工程专业英语词汇手册

Chapter 3 .1 Mining method mining method 采矿方法; mining operation 采矿作业; transportation 运输; ventilation 通风; ground control 顶板管理; recovery 回采率;

subside v. subsidence n.地表沉陷; subsidence control 地表沉陷控制 cover 覆盖层; overburden 上覆地层; immediate roof 直接顶; floor 底板; dip (Pitch) 倾角; hardness 硬度; strength 强度; cleavage 解理; gas,methane 瓦斯 daily operation 日常工作 single operation 单一工序 unit operation 单元作业 auxiliary operation辅助作业 blasting n. 爆破 loading n. 装煤 haul v. 运输,搬运

Chapter 3 .2 Mine Preplanning transportation facility 运输设备 coal reserve 煤炭储量

coordinate n. 坐标。v. (使)互相配合,(使)协调,整。

a multitude(n. 多数,多量) of 大量 capital investment 基本建设投资。 foremost 最主要的,最重要的, minability 可采性 coal reserve 煤矿

preliminary examination 初步调查 operating mine 生产矿井

Chapter 3.3 Mine development

drainage n.排水 lighting n.照明。

disruption in production 停产; room and pillar 房柱式 underground mining 井工开采 outcrop 露头,露出地面的岩层; crosscut 联络巷、石门; drift 平硐; entry 平巷;

development stage 开拓阶段; production stage 生产阶段; continuous miner 连续采煤机; haulage capacity 运输能力; main entry 主巷。 barrier pillar 隔离煤柱; butt entry 区段平巷; property line 矿井边界线。 shearer 滚筒采煤机 planer,Plow 刨煤机 surface mining 露天开采 rapid excavation 快速掘进 hydraulic mining 水力采矿 underground gasification 地下气化

surface topography 地面地形,表面地形 coalfield 煤田 调measure 层组

coal-bearing measure含煤地层 traverse 导线。

traverse with compass 罗盘定位。 prospecting 勘探

drilling pattern 钻孔布置,钻孔图式 basic map 底图,基本地图 log sheet 钻孔柱状图

life expectancy 预期使用年限,使用寿命

portal 井筒

你可能喜欢

  • 工程英语词汇
  • 采矿专业英语词汇
  • 工程专业英语词汇
  • 采矿工程英语
  • 工程英语翻译
  • 煤矿机械
  • 海外工程

采矿工程专业英语词汇手册相关文档

最新文档

返回顶部